Marriott Residences JLT
Luxury JLT Apartments with Marriott Services & Infinity Pool
About project Marriott Residences JLT
Marriott Residences JLT , a 54-story masterpiece by Saba Properties in Jumeirah Lakes Towers (JLT), combines Marriott International’s luxury hospitality with the vibrant energy of Dubai’s most sought-after area. The 210-meter tower spans over 5,000 m².
Units:
- 1–3-Bedroom apartments (82–204 m²).
- Floor-to-ceiling windows, balconies with lake views.
- European-brand furnishings, Siemens appliances, Hansgrohe/TOTO bathrooms.
Amenities:
- Fitness & Leisure: Infinity pool, gym, kids’ play area, padel court, running tracks on 5th floor.
Premium Features:
- 24th Floor: Lounge spaces, open-air cinema, billiard room.
- 52nd Floor: Spa, yoga studio, rooftop cinema.
- Services: Concierge, housekeeping, chef’s kitchen, pet care, babysitting.
Resident Privileges:
- Access to Marriott Bonvoy loyalty program.
- Marriott Onvia platform for smart home management.
Location:
- 10 minutes to Dubai Marina, JBR, Palm Jumeirah.
- 20 minutes to Dubai Mall, 30 minutes to DXB Airport.
- Walkable to DMCC and Sobha Realty metro stations.
Investment Benefits:
- ROI: 7.4% annually due to strong JLT demand.
- Prices: From 1.99M AED (541k $) for 1BR units.
- Payment Plan:10% deposit.40% during construction.15% on handover (Q2 2027).35% over 3 years post-completion.
Marriott Residences JLT offers luxury living with world-class amenities and prime JLT location.
Amenities

Equipped kitchen
Partly furnished
Swimming Pool

Children's Pool
Kids Play Area

Private BBQ Area
Yoga Area
Fully Equipped Gym

Jogging Track
Location

10 min. from International School
10 min. from The Sea
6 min. from Nursery
5 min. from The Pharmacy
5 min. to ATM

10 min. from Metro Station
Near World-class Attractions
Floor Plans
1 Bedroom Type B1
Get all floor price
Leave a request, and we’ll get in touch for a free consultation
Payment plan
Milestone | Date | Installment Amount |
---|---|---|
First Payment | Booking | 10% |
Progress Payments | During construction | 40% |
Completion Payment | Upon Handover | 15% |
Post-Handover Installments | Within 3 Years Post Handover | 35% |